Skip to content

Updated the Solicitation-configuration and TOM-generation services to handle composite SCPS'

In the process:

  • Required that Solicitation-config files contain an item in capabilityParameterSpecifications for each CPS on the Capability being configured
  • Removed the 'performance' CPS on the VLA/Continuum Capability
  • Added multi-select options to VLA/Continuum Capability
  • In the ORM, mapped CPS to Capability like CRP is mapped to CapabilityRequest so that only the roots CPS' are in Capability.capability_parameter_specifications
  • Changed the way SolCaps are populated with SCPS' in the TestDataGenerator to make sure their parents are included.
Edited by Sam Kagan

Merge request reports

Loading